Menu

About Us

Products

Legionella Information

Safety Data Sheets

Delivery Costs

Terms and Conditions

Contact Us

Danum Laboratory Services
Page1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, Printable version (.doc 1.35Mb)

Checklist 2; Hot and cold Water Systems

Service
Task
Frequency

Hot Water Services

Arrange for samples to be taken from hot water calorifiers, in order to note condition of drain water

Check temperatures in flow and return at calorifiers

Check water temperature up to one minute to see if it has reached 50°C in the sentinel taps

Visual check on internal surfaces of calorifiers for scale and sludge. Check representative taps for temperature as above on a rotational basis


Annually

Monthly

Monthly



Annually

Cold Water Systems

Check tank water temperature remote from ball valve and mains temperature at ball valve. Note maximum temperatures recorded by fixed max/min thermometerswhere fitted

Check that temperature is below 20°C after running the water for up to two minutes in the sentinel taps

Visually inspect cold water storage tanks and carry out remedial work where necessary. Check representative taps for temperature as above on a rotational basis

Six monthly




Monthly



Annually

Shower heads


Little used Outlets

Dismantle, clean and descale shower heads and hoses.

Flush through and purge to drain, or purge to drain immediately before use, without release of aerosols

Quarterly or as necessary


Weekly

Chesklist 3; Other risk systems

Service
Task
Frequency

Ultrasonic Humidifiers / foggers and water mistingsystems

If equipment fitted with UV lights, check to ensure effectiveness of lamp (check to see if within working life) and clean filters

Ensure automatic purge of residual water is functioning

Clean and disinfect all wetted parts

Sampling for legionella

Six monthly or according to manufacturer's instructions

As part of machinery shut down

As indicated by risk assessment
As indicated by risk assessment

Spray humidifiers, air washers and wet scrubbers

Clean and disinfect spray humidifiers/air washers and make-up tanks including all wetted surfaces, descaling as necessary

Confirm the operation of non-chemical water treatment (if present)


Six monthly


Weekly


Water softeners



Emergency showers and eye wash sprays

Sprinkler and hose reel systems


Lathe and machine tool coolant systems

Spa baths




Horticultural misting systems


Dental equipment

Car/bus washes


Indoor fountainsand water features


Clean and disinfect resin and brine tank - check with manufacturer what chemicals can be used to disinfect resin bed


Flush through and purge to drain

When witnessing tests of sprinkler blow - down and hose reels ensure that there is minimum risk of exposure to aerosols

Clean and disinfect storage and distribution system


Check filters - sand filters should be backwashed daily
Check water treatment - pools should be continuously treated with an oxidizing biocide
Clean and disinfect entire system

Clean and disinfect distribution pipe work, spray heads and make-up tanks including all wetted surfaces, descaling as necessary

Drain down and clean

Check filtration and treatment system, clean and disinfect system

Clean and disinfect ponds, spray heads and make-up tanks including all wetted surfaces, descaling as necessary


As recommended by manufacturer


Six monthly or more frequently if recommended by manufacturers

As directed


Six monthly


Daily
Three times daily

Weekly


Annually

At the end of each working day

See manufacturers'instructions

Interval depending on condition



Back to top

© Danum Laboratory Services 2005